|
Product Details:
Payment & Shipping Terms:
|
Desk Frame: | Steel Tube | Structure: | Knocked Down |
---|---|---|---|
Steel Desk Surface: | Powder Coating | Wooden Top Material: | MDF+MFC |
Wire Box: | Yes | Cable Box: | Yes |
Desk Color: | White | Quality Certificate: | 5 Year |
1 person Module design full set office desk L1200XW600XH750mm offer sample
Name:1 person office table
Spare part: full steel frame +wooden top+screen+wire box+cable box
Steel frame structure:five angle steel tube,1.5mm thickness
Desk Wooden top: 25mm thickness MDF+MFC ,PVC Cover
Desk Wooden top color: White or other color available
Desk Steel frame color:white or RAL color available
Wooden top thickness:25mm ,PVC cover
Steel frame shape: Mouth and square shape available
Service: we can provide very helpful supports on layout analysis and drawing when ordered places
Delivery time:15 days after getting the order
Items NO. | BT-ROME-01 |
Material | Metal and steel tube |
Steel tube structure | Five angle steel tube |
Wooden top Material |
MDF+MFC MDF:Medium Density Fiberboard MFC:melamine faced chipboard |
Wooden top Size |
L1200XW600XH750mm L1400XW700XH750mm L1600XW800XH750mm L1800XW900XH750mm Or customized size |
Spare part | Screen ,wire box,cable box,Snake shape tube |
Payment | T/T with 30% deposite before production,70% balance before delivery. |
Lead Time | 15-20 Days |
MOQ | 1 PCS |
Unit Volume(CBM) | Please contact with our sales team for more details |
1 SETS | |
Packaging details | 1.Knocked down structure 2.Outer exported standard carton 3.Inner box, using PEP foam 4.All of the production are inspected carefully by QC before delivery. |
Seaport name | Qingdao shanghai available |
Wooden top material advantage:
E1 E0 level MDF environmental protection ecological board
Eco-friendly
National maddatory standard
High strength
Flat surface not easily deformed
Insect control and corrosion treatment
International environmental standards high quality Eco-environmental wood board base material
Anti-scalding without distortion
Scratch resistant,wear resistant and durable
Water proof,non-fading ,easy to clear
Office desk steel frame details:
The structure: It has leg and beam to compose
The leg structure: Five angle steel tube, the thickness:1.5mm before coating, Cold roll steel tube material
The beam material:25*50mm steel tube
The leg surface treatment:Powder coating surface
Color:white black gray,silver gray, Please reference the RAL color
Snake cable manager details:
Application: snake cable manager cable wire management for office desk workstation
Hanging cables underneath the desk
- Links can be removed to reduce the height
- Reduce hazards to cables from damages and dust
- Stylish metallic look and easy to install
- Enables cables to be led out at any point
- Material: ABS Plastic
Snake cable manager details:
Application: snake cable manager cable wire management for office desk workstation
Hanging cables underneath the desk
- Links can be removed to reduce the height
- Reduce hazards to cables from damages and dust
- Stylish metallic look and easy to install
- Enables cables to be led out at any point
- Material: ABS Plastic
The office furniture manufacture process as following:
1. Cutting: According to the design-drawings, the steel sheets(open and flat) are cut into different sizes by the high-accurated machines, without errors or burrs.
2. Pressing: The CNC machine tools and other machine tools work with the big-scale mould together to reach the required standard and cooperate with the flow line production, which assure the production efficiency and quality
3. Bending: Skilled workers and advanced facilities make sure the clear lines and perfect appearance
4. Welding: Locate the work pieces into the corresponding mould, firmly weld with CO2 shielded welding or argon-arc welding and including the laser welding then conduct slag removing and polishing.To insure all the edge must be flat without burrs,we will need to ask the worker to grind the corner.
5. Powder Coating process: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing, phosphating etc. The imported automatic spray facilities and top-quality powder promise the coating to be flat and smooth, non-toxic and no smell.
All the process will need to pre-check by the worker, and then the Professional inspector will check again, the next steop will checking by team leader.
6. Installation: To ensure the firmness of every screw, the installation workshop adopts pneumatic tools to conduct mass and flowline production
7. Assembly and packing: Strict and special testing before packing and storage to make sure the products are highly-qualified.
Contact Person: Jean Yang
Tel: 18137709722