|
Product Details:
Payment & Shipping Terms:
|
Material: | SPCC | Structure: | KD Structure |
---|---|---|---|
Volume: | 0.09CBM | Color: | White Grey Blue Black RAL Color Available |
Employee used single door steel locker H1850XW390XD500mm White/greyblue color available
For the single door steel locker dimension and loading qty as follows:
Name | steel locker BT-G001,Iron locker BT-G001,Clothes-exchanged cabinet BT-G001, Steel locker cabinet BT-G001 |
Dimension |
H1850XW380XD450 mm Height:1850mm Width:380mm Depth:450mm Remark:if you need Custom-made dimension, Please tell us your requirement,our engineer will design for you. |
Material | Regular height: 0.6mm,Cold rolled steel plate (0.5-1.2mm is available ) |
specfication | 1.vent hole,2.label,3.hanger,4.fixed shelf |
Handle structure | Steel or Plastic handle available |
Locker and Handle color | White, orange,Beige,charcoal, or any RAL color is available |
Surface treatment | Electrostaic powder coating epoxy resin finish,NO smell and no harm to people health and environment. |
Delivery time: | in stock,If ex-stock,It will need 30 days after getting the order |
Structure | Knocked down or flat packing or your required |
Package |
1).the locker cabinet are knocked down 2).5 ply standard export with polyfoam inner lining 3).PE foam between piece and piece,paper corner protections 4).All the assecories of 1 unit will be package in one individualy plastic bag 5).one piece package in one carton,seal with tape and packling belts. |
MOQ | 20 GP, Sample is available |
Application | Office,school,home,hotel,hospital,company,factory, and other commercial area, stuff room, changing room, gym, government,swimming pool,indoor stadium,bath house,indoor pool, etc |
The office furniture manufacture process as following:
1. Cutting: According to the design-drawings, the steel sheets(open and flat) are cut into different sizes by the high-accurated machines, without errors or burrs.
2. Pressing: The CNC machine tools and other machine tools work with the big-scale mould together to reach the required standard and cooperate with the flow line production, which assure the production efficiency and quality
3. Bending: Skilled workers and advanced facilities make sure the clear lines and perfect appearance
4. Welding: Locate the work pieces into the corresponding mould, firmly weld with CO2 shielded welding or argon-arc welding and including the laser welding then conduct slag removing and polishing.To insure all the edge must be flat without burrs,we will need to ask the worker to grind the corner.
5. Powder Coating process: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing, phosphating etc. The imported automatic spray facilities and top-quality powder promise the coating to be flat and smooth, non-toxic and no smell.
All the process will need to pre-check by the worker, and then the Professional inspector will check again, the next steop will checking by team leader.
6. Installation: To ensure the firmness of every screw, the installation workshop adopts pneumatic tools to conduct mass and flowline production
7. Assembly and packing: Strict and special testing before packing and storage to make sure the products are highly-qualified.
Contact Person: Jean Yang
Tel: 18137709722